Battery plants could add 2 million jobs by FY30, Adecco says

Adecco India estimates India's battery industry will create 1.5 to 2 million jobs by FY30, about 25% direct and 75% indirect, with hiring growing 25 to 30% a year. Karnataka (24%), Gujarat (22%), Telangana (18%) and Haryana (14%) take most of the hiring; cell manufacturing and components take 42 to 45% of the jobs.

Two cylindrical lithium-ion cells resting in a yellow holder
Cylindrical lithium-ion cells in the 18650 and 21700 formats, the cell types most battery plants are built to make. Photo: Sevenethics, CC0 1.0, cropped

What happened

Adecco India, the staffing firm, said on 7 September that India’s battery industry could create 1.5 to 2 million jobs by FY30 as the country moves from importing and assembling lithium-ion cells to making them. About 25% of those jobs would be direct and 75% indirect; hiring would grow 25 to 30% a year, Outlook Business reported.

The estimate rests on inputs from Adecco’s thirty-odd clients in the sector, according to Deepesh Gupta, its director and head of general staffing. Cell manufacturing and battery components would account for 42 to 45% of the hiring; recycling would grow 25 to 30%. Specialised battery engineers could earn 35 to 40% more than equivalent roles in conventional manufacturing and electronics.

By state, Adecco puts Karnataka at 24% of hiring, Gujarat at 22%, Telangana at 18% and Haryana at 14%, with tier-two and tier-three industrial corridors taking about 30% of the openings. Installed cell capacity is around 60 GWh and expected to approach 100 GWh by the end of 2026. The government’s production-linked incentive for advanced chemistry cells commits ₹18,100 crore for 50 GWh of capacity.

Why it matters

Three of every four jobs in this forecast are indirect: the tool room, the fixture maker, the electrical contractor, the logistics firm and the recycler around the cell plant, not the plant itself. Gujarat’s 22% share puts it second in the country, and its share is built on plants that need exactly the trades exhibiting at a machine-tools show.

For a shop owner the number to watch is not two million; it is the capacity figure. Sixty gigawatt-hours becoming a hundred inside a year means plants under construction now, and plants under construction buy fabrication, material handling and installation before they buy anything else. The PLI scheme behind the cell plants pays the cell maker, not the supplier, so the supplier’s route in is the plant’s procurement, not the scheme. A supplier working the Rajasthan end of that list has one date on the EngiExpo circuit in the state: EngiExpo Jaipur 2027 carries that edition’s dates, venue and the sectors the organiser names.

What happens next

The forecast runs to FY30, so the first test of it is the capacity figure at the end of 2026. EngiNewsIndia will track cell-plant announcements in Gujarat, Maharashtra and Rajasthan as they are filed, on the electrical, electronics and solar beat. The Adecco report itself has not been published as a document; the figures above are as the company stated them to the press. If a firm of your size is registered as an MSME, the state industrial policies that sit alongside the PLI are the schemes to read next.

Sources

  1. Outlook Business — India's battery industry set to generate up to 2 mn jobs by FY30: Adecco India · checked 2026-09-20
  2. Free Press Journal — India's battery boom could power up to 2 million new jobs by FY30, Adecco India forecasts · checked 2026-09-20